-
OSHA Caution: This Machine Must Be Locked Out Prior To Servicing
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD -
OSHA Danger: Do Not Enter Until Lockout-Tagout Procedures Are Complete
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD -
OSHA Danger: Lock Out Before Servicing (with Lock Graphic)
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD -
Lockout Point Label
Regular price $11.99 USDRegular priceUnit price / perSave price $11.99 USD -
Bilingual OSHA Danger: Lock Out Electrical Switches Before Working On Machinery
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD -
OSHA Danger: Lock-Out/Tag-Out Power Before Servicing, Repairing, Cleaning Or Retooling Equipment
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD -
Lockout Before Servicing: Lockout Point
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD -
Bilingual OSHA Danger: Lock Out Before Entry
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD -
OSHA Danger: Lockout/Tagout Before Set-Up, Maintenance, Service Or Repair
Regular price From $11.99 USDRegular priceUnit price / perSave price From $11.99 USD
FAQ's
What is a Lockout Before Servicing sign used for?
The Lockout Before Servicing sign is used to tell workers that they must lock out all energy sources on a machine before they do any maintenance, repair, cleaning or adjustment on the machine. This Lockout Before Servicing sign is like a reminder that's always on the machine and it tells people that no one should touch the machine when it is being serviced unless they follow the lockout procedure first.
Where should Lockout Before Servicing signs be placed?
These Lockout Before Servicing signs should be placed on the machine near the controls that start the machine on the panels and doors that people use to get to the machine, on the switches that disconnect the power, and at any point where the equipment could be turned on. The sign should be placed in such a place that it is clearly visible to the workers.
What OSHA standard requires this type of signage?
The OSHA standard that requires Lockout Before Servicing signs is OSHA 29 CFR 1910.147, which's the standard for controlling hazardous energy. Another standard, OSHA 29 CFR 1910.145 covers the rules for signs and tags that are used to prevent accidents.
Is a Lockout Before Servicing sign the same as a lockout tag?
No, a Lockout Before Servicing sign is not the same as a lockout tag. A lockout tag is something that can be removed. It is put on a specific point on the machine when someone is working on it. A Lockout Before Servicing sign is a label that's always on the equipment and it tells people about the lockout rule. Many facilities use both Lockout Before Servicing signs and lockout tags as part of their lockout program.
Can these signs be used on all types of machinery?
Yes Lockout Before Servicing signs can be used on all types of machines. They can be used on equipment, hydraulic and pneumatic systems, conveyors, presses, compressors and any machine that could hurt someone if it starts up when it is being serviced. If a machine has an energy source and needs to be serviced then it should have a Lockout Before Servicing sign on it.
Do these signs replace a written lockout/tagout procedure?
No Lockout Before Servicing signs do not replace a written lockout procedure. Facilities still need to have a written procedure, train their employees and actually isolate the energy. The Lockout Before Servicing sign just reminds people of these requirements by putting the message where it matters most.
What types of energy sources do these signs apply to?
Lockout Before Servicing signs apply to all types of energy sources: electrical, hydraulic, pneumatic, mechanical, thermal and chemical. Any machine that has energy source that could hurt someone if it is released during servicing needs to have a Lockout Before Servicing sign before the servicing starts. This includes Lockout Before Servicing signs, for energy, hydraulic energy, pneumatic energy and all other types of energy.
What size options are available?
Hazard signs come in different sizes. Some common sizes for hazard signs are 3.5" x 5", 5" x 7", 7" x 10", 10" x 14" These sizes ensure that hazard signs are visible and easy to read. Hazard signs need to be big enough to grab people's attention and small enough to fit in the space available